At Nickelhütte Aue, our experienced service team successfully avoided the costly replacement of a decades-old waste heat boiler. Through precise diagnostics, we determined that more than half of the boiler was in near-new condition. Revitalization proved to be a significantly more economical and time-saving solution. The result: maximum efficiency, minimal downtime and long-term cost savings.
With TÜV-certified structural integrity and upgraded components, the boiler is now fully prepared for reliable operation, a result achieved in just six weeks rather than the full year required for a total replacement.